Browse By

Tag Archives: DYNAMIC DRAFT

ECDIS Contour Setting depth

Safety Contour = Dynamic draft + Minimum Net UKC requirement – Height of tide Shallow Contour = One Contour less than Safety Contour 1. Why Height of Tide is being subtracted from the Safety Contour depth?   Why it is not added, as we do for